![Loading...](https://link.springer.com/static/c4a417b97a76cc2980e3c25e2271af3129e08bbe/images/pdf-preview/spacer.gif)
-
Article
Programming time-dependent behavior in 4D printing by geometric and printing parameters
Smart structures realize sequential motion and self-assembly through external stimuli. With the advancement of four-dimensional (4D) printing, the programming of sequential motions of smart structures is endow...
-
Article
Erratum to: Multi-principle preventive maintenance: a design-oriented scheduling study for mechanical systems
-
Article
Multi-principle preventive maintenance: a design-oriented scheduling study for mechanical systems
Preventive maintenance (PM) is very important for the safe, efficient, and reliable operation of mechanical systems. This paper focuses on one of the most challenging tasks for PM: PM scheduling. Two basic pri...
-
Article
A new multi-objective ant colony algorithm for solving the disassembly line balancing problem
The disassembly line is the best choice for automated disassembly of disposal products. Therefore, disassembly line should be designed and balanced so that it can work as efficiently as possible. In this paper...