We are improving our search experience. To check which content you have full access to, or for advanced search, go back to the old search.

Search

Please fill in this field.
Filters applied:

Search Results

Showing 1-20 of 1,021 results
  1. From tunnel boring machine to tunnel boring robot: perspectives on intelligent shield machine and its smart operation

    Advances in intelligent shield machines reflect an evolving trend from traditional tunnel boring machines (TBMs) to tunnel boring robots (TBRs). This...

    Yakun Zhang, Guofang Gong, ... Liujie **g in Journal of Zhejiang University-SCIENCE A
    Article 07 May 2024
  2. Carbon Footprint Evaluation in Tunnels Excavated in Rock Using Tunnel Boring Machine (TBM)

    The generation of CO 2 is an important element in assessing the environmental impact generated in a tunnel construction project, making this knowledge...

    Rafael Rodríguez, Marc Bascompta, Héctor García in International Journal of Civil Engineering
    Article Open access 30 January 2024
  3. Clogging of slurry-shield tunnel-boring machine drives in sedimentary soft rock: A case study

    This paper presents a case study of the clogging of a slurry-shield tunnel-boring machine (TBM) experienced during tunnel operations in clay-rich...

    Chengyong Cao, **angsheng Chen, ... Zuxian Wang in Frontiers of Structural and Civil Engineering
    Article 01 October 2023
  4. A data-driven approach for modeling and predicting the thrust force of a tunnel boring machine

    Thrust prediction of a tunnel boring machine (TBM) is crucial for the life span of disc cutters, cost forecasting, and its design optimization. Many...

    Lintao Wang, Fengzhang Zhu, ... Wei Sun in Journal of Zhejiang University-SCIENCE A
    Article 01 September 2023
  5. Enhanced wear prediction of tunnel boring machine disc cutters for accurate remaining useful life estimation using a hybrid model

    In tunnel construction with tunnel boring machines (TBMs), accurate prediction of the remaining useful life (RUL) of disc cutters is critical for...

    **nghai Zhou, Yakun Zhang, ... Zhixue Su in Frontiers of Structural and Civil Engineering
    Article 01 April 2024
  6. Drainage design combining drain holes and pinholes for tunnel boring machine segments subject to high water pressure

    Balance of the groundwater and ecology is crucial for controlled discharge. However, regarding the segments of tunnel boring machines (TBMs) under...

    Yao Lu, Ming Huang, ... Guangzhao Du in Frontiers of Structural and Civil Engineering
    Article 01 November 2023
  7. Probabilistic Evaluation of Tunnel Boring Machine Penetration Rate Based on Case Analysis

    Although geological parameters are known to affect the penetration rate (PR) of a tunnel boring machine (TBM), their relation to the probability of...

    Guangkun Li, Yiguo Xue, ... Xudong Jiang in KSCE Journal of Civil Engineering
    Article 21 August 2022
  8. Design Method of Anti-Damage and Anti-Crack for Main Parameters of Tunnel Boring Machine Cutter Head

    In the actual service process of the tunnel boring machine (TBM) cutter head, the fatigue failure of the disc body is serious. Aimed at the problem...

    Article 12 November 2022
  9. Greenfield settlements due to tunnelling using tunnel boring machine (TBM) in layered soils: a parametric study

    As India’s cities continue to increase in population, a large number of new metro lines are being built to accommodate the mobility of residents. For...

    Jyoti Agarwal, Raju Sarkar in Sādhanā
    Article 15 February 2024
  10. Load Characteristics and Optimal Layout of Center and Gage Cutters of Rock Formation Compound Tunnel Boring Machine

    The cutter layout of a full-face tunnel boring machine (TBM) directly affects its tunneling efficiency. The revolving diameter of the center cutter...

    Kangjian Zhang, Zhechuan Hu, Zhiqiang Zhang in Journal of Shanghai Jiaotong University (Science)
    Article 30 November 2022
  11. Dynamic prediction and multi-objective optimization on driving position of tunnel boring machine (TBM): an automated deep learning approach

    This paper proposes an automated deep learning (AutoDL) framework for dynamic prediction and multi-objective optimization (MOO) on the driving...

    Yue Pan, Ziyi Wang, ... **-Jian Chen in Acta Geotechnica
    Article 27 February 2024
  12. Point and interval estimation of rock mass boreability for tunnel boring machine using an improved attribute-weighted deep belief network

    The rock mass boreability assessment for tunnel boring machine (TBM) is of great significance for safe and efficient tunneling. This study presented...

    **n Yin, **ng Huang, ... Quansheng Liu in Acta Geotechnica
    Article 24 September 2022
  13. Assessment of rate of penetration of a tunnel boring machine in the longest railway tunnel of Turkey

    One of the most important issues in tunnels to be constructed with tunnel boring machines (TBMs) is to predict the excavation time. Excavation time...

    Candan Gokceoglu in SN Applied Sciences
    Article Open access 14 December 2021
  14. Intelligent assistant driving method for tunnel boring machine based on big data

    During tunnel construction with tunnel boring machine (TBM), the TBM drivers determine the driving parameters depending only on their own...

    Dong Guo, **hui Li, ... Zuyu Chen in Acta Geotechnica
    Article 16 August 2021
  15. Research on Dust Migration Law and Dust Reduction Efficiency in the Operation Process of Tunnel Boring Machine

    At present, most dust reduction methods do not consider the difference of dust particle diameter distribution along the tunnel and the applicability...

    Ning Liu, Kun Chen, ... Yi-**ong Huang in KSCE Journal of Civil Engineering
    Article 27 December 2021
  16. Development of a novel muck removal hydraulic manipulator for automated steel arch assembly of tunnel boring machine

    The muck-removal at the bottom of the tunnel is a major constraint on the construction progress and advance rate. Removing the muck in a timely and...

    Article 29 May 2024
  17. Analysis of Stress Induced Deformation and Evaluation of Performance of Tunnel Boring Machine in Extraordinary Geological Conditions Encountered During Excavation of Longest Head Race Tunnel in Himalaya: A Case Study

    The paper reviews major geological problems encountered during construction of the longest Head Race Tunnel (HRT) of length 31.5 km in the hydropower...
    Mainak Ghosh Roy, Sajan Moideen, ... Biswajit Basu in Sustainable Civil Engineering at the Beginning of Third Millennium
    Conference paper 2024
  18. Theorical Modelling of Longitudinal Wave Propagation Emitted by a Tunnel Boring Machine in a Finite Domain

    Boring shallow tunnels in urban areas generates ground-borne vibrations with energy distributed over a wide range of frequencies, up 100 Hz during...
    Antoine Rallu, Denis Branque in Recent Trends in Wave Mechanics and Vibrations
    Conference paper 2023
Did you find what you were looking for? Share feedback.