Chapter
Scope
This standard specifies the construction technology and related operations of pipe jacking.
-
Chapter
Technical Files
The original record of pipe jacking should include the following: (1) Pipe jacking construction site survey form; (2) Back installation acceptance record; (3) Acceptance record of guide rail installation in fo...
-
Chapter
Normative References
The following documents are indispensable for the application of this standard.
-
Chapter
Production Management
Before construction, units in charge of design and construction should jointly compile the “Pipe Jacking Construction Organization Design”.
-
Chapter
Basic Rules
According to the diameter of the pipe installed, pipe jacking is divided into micro-diameter, small-diameter, medium-diameter, large-diameter, and mega-diameter.
-
Chapter
Construction Monitoring
This chapter introduces the monitoring work should do when installing the pipe with pipe jacking method, such as the monitoring time and objects, monitring mode, monitoring frequency, monitor itmes and so on.
-
Chapter
Health, Safety and Environmental Protection Management
(1) It shall meet the requirements of national and local labor protection laws and regulations. (2) Construction personnel should be equipped with corresponding labor protection equipment.
-
Chapter
Working Pit
The working pit for pipe jacking includes jacking pit and receiving pit.
-
Chapter
Special Pipe Jacking
This chapter introduces the contruction method for the special type pipe jacking, such as micro-diametre pipe jacking, extro-long distance pipe jacking, and special shaped pipe Jacking and so on.
-
Chapter
Treatment After Jacking
This chapter introduce the work should do after the penetration.
-
Chapter
Construction Organization Design
During the design and construction of pipe jacking, various factors should be considered comprehensively, and the method and technology of pipe jacking should be optimized to meet the requirements of pipeline ...
-
Chapter
Engineering Quality and Acceptance
This chapter introduced how to accetance the pipe jacking construction.
-
Chapter
Engineering Environment and Geological Survey
The object of engineering environment survey is the construction site environment, which refers to the things that have an impact on the construction of the project or the construction has an impact on it, inc...
-
Chapter
Pipe Jacking Equipment and Instruments
Jacking pit unit: including jacking pit, receiving pit, water stop ring, back iron, guide rail in foundation pit.
-
Chapter
Pipe Jacking Construction Measures
This chapter introduces some meausres should be done during the pipe jacking construction, such as the corrective measures, reducing resistance and so on.
-
Chapter
Pipe for Pipe Jacking
The pipe cross section of pipe jacking has round, rectangular and other shapes.
-
Book
-
Chapter
Jacking Construction
This chapter introduces the construction method and process for different pipe jacking.
-