Skip to main content

and
  1. No Access

    Article

    Project management and scheduling 2021

    Christian Artigues, Cyril Briand, Pierre Lopez in Annals of Operations Research (2024)

  2. No Access

    Article

    Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective

    This paper deals with a scheduling problem arising at the tactical decision level in aeronautical assembly line. It has the structure of a challenging multi-mode resource-constrained project scheduling problem...

    Tamara Borreguero Sanchidrián, Tom Portoleau in Annals of Operations Research (2023)

  3. No Access

    Article

    Energetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functions

    This paper addresses a scheduling problem with a continuously divisible, cumulative and renewable resource with limited capacity. During its processing, each task consumes a part of this resource, which lies b...

    Margaux Nattaf, Christian Artigues, Pierre Lopez, David Rivreau in OR Spectrum (2016)

  4. No Access

    Article

    Energetic reasoning for energy-constrained scheduling with a continuous resource

    This paper addresses a scheduling problem with continuous resources and energy constraints. Given a set of non-preemptive activities, each activity requires a continuously divisible resource whose instantaneou...

    Christian Artigues, Pierre Lopez in Journal of Scheduling (2015)

  5. No Access

    Chapter

    Mixed-Integer Linear Programming Formulations

    In this chapter, (mixed-)integer linear programming formulations of the resource-constrained project scheduling problem are presented. Standard formulations from the literature and newly proposed formulations ...

    Christian Artigues, Oumar Koné, Pierre Lopez in Handbook on Project Management and Schedul… (2015)

  6. No Access

    Article

    Schedule Generation Schemes for the Job-Shop Problem with Sequence-Dependent Setup Times: Dominance Properties and Computational Analysis

    We consider the job-shop problem with sequence-dependent setup times. We focus on the formal definition of schedule generation schemes (SGSs) based on the semi-active, active, and non-delay schedule categories...

    Christian Artigues, Pierre Lopez, Pierre-Dimitri Ayache in Annals of Operations Research (2005)

  7. No Access

    Article

    Modelling and managing disjunctions in scheduling problems

    In this paper is presented a method for modelling and managing various constraints encountered in task scheduling problems. The approach aims at characterizing feasible schedules through the analysis of the se...

    Patrick Esquirol, Marie -Jo Huguet, Pierre Lopez in Journal of Intelligent Manufacturing (1995)