Skip to main content

and
  1. No Access

    Article

    Project management and scheduling 2021

    Christian Artigues, Cyril Briand, Pierre Lopez in Annals of Operations Research (2024)

  2. No Access

    Article

    Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective

    This paper deals with a scheduling problem arising at the tactical decision level in aeronautical assembly line. It has the structure of a challenging multi-mode resource-constrained project scheduling problem...

    Tamara Borreguero Sanchidrián, Tom Portoleau in Annals of Operations Research (2023)

  3. No Access

    Chapter and Conference Paper

    Constraint Programming for the Robust Two-Machine Flow-Shop Scheduling Problem with Budgeted Uncertainty

    This paper addresses the robust two-machine permutation flow-shop scheduling problem considering non-deterministic operation processing times associated with an uncertainty budget. The objective is to minimize...

    Carla Juvin, Laurent Houssin, Pierre Lopez in Integration of Constraint Programming, Art… (2023)

  4. No Access

    Article

    Cumulative scheduling with variable task profiles and concave piecewise linear processing rate functions

    We consider a cumulative scheduling problem where a task duration and resource consumption are not fixed. The consumption profile of the task, which can vary continuously over time, is a decision variable of t...

    Margaux Nattaf, Christian Artigues, Pierre Lopez in Constraints (2017)

  5. No Access

    Article

    Energetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functions

    This paper addresses a scheduling problem with a continuously divisible, cumulative and renewable resource with limited capacity. During its processing, each task consumes a part of this resource, which lies b...

    Margaux Nattaf, Christian Artigues, Pierre Lopez, David Rivreau in OR Spectrum (2016)

  6. No Access

    Article

    A hybrid exact method for a scheduling problem with a continuous resource and energy constraints

    This paper addresses a scheduling problem with a cumulative continuous resource and energy constraints. Given a set of non-preemptive tasks, each task requires a continuously-divisible resource. The instantane...

    Margaux Nattaf, Christian Artigues, Pierre Lopez in Constraints (2015)

  7. No Access

    Article

    Energetic reasoning for energy-constrained scheduling with a continuous resource

    This paper addresses a scheduling problem with continuous resources and energy constraints. Given a set of non-preemptive activities, each activity requires a continuously divisible resource whose instantaneou...

    Christian Artigues, Pierre Lopez in Journal of Scheduling (2015)

  8. No Access

    Chapter

    Mixed-Integer Linear Programming Formulations

    In this chapter, (mixed-)integer linear programming formulations of the resource-constrained project scheduling problem are presented. Standard formulations from the literature and newly proposed formulations ...

    Christian Artigues, Oumar Koné, Pierre Lopez in Handbook on Project Management and Schedul… (2015)

  9. No Access

    Chapter

    Biased Random Key Genetic Algorithm for Multi-user Earth Observation Scheduling

    This paper presents a biased random key genetic algorithm, or BRKGA, for solving a multi-user observation scheduling problem. BRKGA is an efficient method in the area of combinatorial optimization. It is usual...

    Panwadee Tangpattanakul, Nicolas Jozefowiez in Recent Advances in Computational Optimizat… (2015)

  10. No Access

    Article

    Scheduling scientific experiments for comet exploration

    The Rosetta/Philae mission was launched in 2004 by the European Space Agency (ESA). It is scheduled to reach the comet 67P/Churyumov-Gerasimenko in November 2014 after traveling more than six billion kilometer...

    Gilles Simonin, Christian Artigues, Emmanuel Hebrard, Pierre Lopez in Constraints (2015)

  11. No Access

    Article

    Comparison of mixed integer linear programming models for the resource-constrained project scheduling problem with consumption and production of resources

    This paper addresses an extension of the resource-constrained project scheduling problem that takes into account storage resources which may be produced or consumed by activities. To solve this problem, we pro...

    Oumar Koné, Christian Artigues, Pierre Lopez in Flexible Services and Manufacturing Journal (2013)

  12. No Access

    Article

    Weight-based Heuristics for Constraint Satisfaction and Combinatorial Optimization Problems

    In this paper, we propose mechanisms to improve instantiation heuristics by incorporating weighted factors on variables. The proposed weight-based heuristics are evaluated on several tree search methods such a...

    Marie-José Huguet, Pierre Lopez, Wafa Karoui in Journal of Mathematical Modelling and Algo… (2012)

  13. No Access

    Chapter and Conference Paper

    Multi-objective Optimization for Selecting and Scheduling Observations by Agile Earth Observing Satellites

    This paper presents a biased random-key genetic algorithm for solving a multi-objective optimization problem concerning the management of agile Earth observing satellites. It addresses the selection and schedu...

    Panwadee Tangpattanakul, Nicolas Jozefowiez in Parallel Problem Solving from Nature - PPS… (2012)

  14. No Access

    Chapter and Conference Paper

    Scheduling Scientific Experiments on the Rosetta/Philae Mission

    The Rosetta/Philae mission was launched in 2004 by the European Space Agency (ESA). It is scheduled to reach the comet 67P/Churyumov-Gerasimenko in 2014 after traveling more than six billion kilometers. The Ph...

    Gilles Simonin, Christian Artigues in Principles and Practice of Constraint Prog… (2012)

  15. No Access

    Chapter and Conference Paper

    Complete Characterization of Near-Optimal Sequences for the Two-Machine Flow Shop Scheduling Problem

    In a two-machine flow shop scheduling problem, the set of ε-approximate sequences (i.e., solutions within a factor 1 + ε of the optimal) can be mapped to the vertices of a permutation lattice.

    Jean-Charles Billaut, Emmanuel Hebrard in Integration of AI and OR Techniques in Con… (2012)

  16. No Access

    Chapter and Conference Paper

    Climbing Depth-Bounded Adjacent Discrepancy Search for Solving Hybrid Flow Shop Scheduling Problems with Multiprocessor Tasks

    This paper considers multiprocessor task scheduling in a multistage hybrid flow-shop environment. The problem even in its simplest form is NP-hard in the strong sense. The great deal of interest for this probl...

    Asma Lahimer, Pierre Lopez, Mohamed Haouari in Integration of AI and OR Techniques in Con… (2011)

  17. No Access

    Chapter and Conference Paper

    YIELDS: A Yet Improved Limited Discrepancy Search for CSPs

    In this paper, we introduce a Yet ImprovEd Limited Discrepancy Search (YIELDS), a complete algorithm for solving Constraint Satisfaction Problems. As indicated in its name, YIELDS is an improved version of Lim...

    Wafa Karoui, Marie-José Huguet, Pierre Lopez in Integration of AI and OR Techniques in Con… (2007)

  18. No Access

    Book

  19. No Access

    Article

    Schedule Generation Schemes for the Job-Shop Problem with Sequence-Dependent Setup Times: Dominance Properties and Computational Analysis

    We consider the job-shop problem with sequence-dependent setup times. We focus on the formal definition of schedule generation schemes (SGSs) based on the semi-active, active, and non-delay schedule categories...

    Christian Artigues, Pierre Lopez, Pierre-Dimitri Ayache in Annals of Operations Research (2005)

  20. No Access

    Article

    Modelling and managing disjunctions in scheduling problems

    In this paper is presented a method for modelling and managing various constraints encountered in task scheduling problems. The approach aims at characterizing feasible schedules through the analysis of the se...

    Patrick Esquirol, Marie -Jo Huguet, Pierre Lopez in Journal of Intelligent Manufacturing (1995)