Skip to main content

and
  1. No Access

    Chapter and Conference Paper

    Effect of Organic Retarders on Fluid-State and Strength Development of Rock-Based Geopolymer

    Granite waste is rich in aluminum and silicate has the potential of turning to geopolymer material after mixing with an alkali solution.

    Mohammadreza Kamali, Mahmoud Khalifeh in International RILEM Conference on Synergis… (2023)

  2. Article

    Open Access

    Retarding mechanism of Zn2+ species in geopolymer material using Raman spectroscopy and DFT calculations

    Geopolymers are the most promising alternative to Ordinary Portland Cement for oil-well cementing and well abandonment. To that end, the slurry needs a required pum** time ensured by the addition of retarder...

    Fawzi Chamssine, Luiz H. S. Gasparotto, Miguel Angelo Fonsecade Souza in Scientific Reports (2022)

  3. Chapter

    Introduction

    Every beginning has an end. This book covers the beginning of the end of well life. When a well reaches the end of its life, it must permanently be plugged and abandoned. Plug and abandonment can easily contr...

    Mahmoud Khalifeh, Arild Saasen in Introduction to Permanent Plug and Abandonment of Wells (2020)

  4. Chapter

    Different Categories of Working Units

    When considering permanent plug and abandonment of hydrocarbon wells, location of the well plays a critical role; location can be either onshore or offshore. For onshore wells, the well depth, downhole pressur...

    Mahmoud Khalifeh, Arild Saasen in Introduction to Permanent Plug and Abandonment of Wells (2020)

  5. Chapter

    Types of Permanent Plugging Materials

    Portland cement is the prime material used for zonal isolation and permanent P&A of wells. However, there are some concerns which persuade engineers to search for alternative materials to Portland cement. Ther...

    Mahmoud Khalifeh, Arild Saasen in Introduction to Permanent Plug and Abandonment of Wells (2020)

  6. Chapter

    Work Classification and Selection of Working Units

    As reviewed in the previous chapter, there are different types of working units employed for permanent P&A operations depending on the well location and type of production facility. When considering onshore we...

    Mahmoud Khalifeh, Arild Saasen in Introduction to Permanent Plug and Abandonment of Wells (2020)

  7. Chapter

    Tools and Techniques for Plug and Abandonment

    In permanent P&A, establishment of a rock-to-rock barrier is a requirement. There are situations where the annular barrier behind casing is not qualified or there is no annular barrier. Therefore, full access ...

    Mahmoud Khalifeh, Arild Saasen in Introduction to Permanent Plug and Abandonment of Wells (2020)

  8. Chapter

    Specification for Permanent Plugging Materials

    Portland cement is currently the prime barrier material used in the petroleum industry for zonal isolation and permanent well abandonment. In addition, the industry considers alternative plugging materials. Th...

    Mahmoud Khalifeh, Arild Saasen in Introduction to Permanent Plug and Abandonment of Wells (2020)

  9. Chapter

    Fundamentals of Plug Placement

    The best practice of permanent plug and abandonment requires a cross sectional barrier, which is known as rock-to-rock barrier. The barrier is placed at the right depth where formation is capable to hold the maxi...

    Mahmoud Khalifeh, Arild Saasen in Introduction to Permanent Plug and Abandonment of Wells (2020)

  10. Chapter

    Barrier Verification

    The main goal of a P&A operation is to restore the cap rock functionality by establishing competent barriers. When a barrier is established, its functionality needs to be verified. There are different test pro...

    Mahmoud Khalifeh, Arild Saasen in Introduction to Permanent Plug and Abandonment of Wells (2020)