Page
%P
![Loading...](https://link.springer.com/static/c4a417b97a76cc2980e3c25e2271af3129e08bbe/images/pdf-preview/spacer.gif)
-
Article
LI-RADS treatment response algorithm after first-line DEB-TACE: reproducibility and prognostic value at initial post-treatment CT/MRI
To evaluate the inter-reader reproducibility and prognostic accuracy of the Liver Imaging Reporting and Data System (LI-RADS) treatment response algorithm (LR-TR) at the time of initial post-treatment evaluati...
-
Chapter and Conference Paper
Stability Assessment of the Embankment Dam Systems Under Different Seismic Loads in Southern California and Evaluation of the Current Design Criteria
The integrity of system of embankment dams and levees is a crucial component in ensuring the safety of protected communities in any country. The failure of such systems due to natural or man-made hazards can h...