We are improving our search experience. To check which content you have full access to, or for advanced search, go back to the old search.

Search

Please fill in this field.
Filters applied:

Search Results

Showing 41-49 of 49 results
  1. Components of Thermal Apparatus

    Heat exchangers are devices that transfer heat between two or more fluid flows in the direction of the temperature gradient. Their aim is to change...
    Chapter 1994
  2. Manufacturing Processes

    Manufacturing is the production of workpieces of a geometrically defined shape (Kienzle).
    K. Herfurth, L. Kiesewetter, ... M. Weck in Dubbel Handbook of Mechanical Engineering
    Chapter 1994
  3. QC Field Testing

    The quality control (QC) Program usually includes field testing. Traditionally, test requirements are described in the specification wherever (and...
    James J. O’Brien in Construction Inspection Handbook
    Chapter 1989
  4. Sitework

    James J. O’Brien in Construction Inspection Handbook
    Chapter 1989
  5. Assembly

    Although flexibility is now the aim, several of the installations in this section are not flexible. Nevertheless, they represent good examples of...
    T. Suzuki, M. Kohno, ... T. Murai in Flexible Automation in Japan
    Chapter 1984
  6. Rig for failure tests on scaffold towers

    The paper briefly describes the design of a rig capable of testing scaffold towers up to 9 m high and 1.8 m square on plan, for vertical loads up to...

    E. Lightfoot, D. M. Duggan in Matériaux et Construction
    Article 01 November 1975
  7. A Planned Policy for the Designer

    Experience teaches that in all branches of human activity, no matter whether manual or intellectual work is involved, only a systematically planned...
    Robert Matousek in Engineering Design
    Chapter 1963
  8. Measurement and Marking Out

    On the component shown opposite describe or sketch how the pitch circle for the four holes would be marked out when the centre hole has already been...
    C. E. Comber, G. W. Holmes, ... J. B. Pratley in Part 1 Basic Craft Studies
    Chapter 1970
  9. Asarco’s new electrolytic plant at corpus christi, texas

    During 1953 the American Smelting and Refining Co. completed construction of an addition to its Corpus Christi operations. This addition was designed...

    A. C. Jephson, R. E. Allen in JOM
    Article 01 October 1957
Did you find what you were looking for? Share feedback.