Skip to main content

and
  1. No Access

    Article

    Fast start-up of PN/A process in a single-stage packed bed and mechanism of nitrogen removal

    The single-stage partial nitritation–anammox (PN/A) process is severely limited by a long start-up time and unstable removal efficiency. In this study, PN/A was developed in 67 days in a novel packed bed equip...

    Yaqi **e, Chuanyi Zhang, Limei Yuan in Environmental Science and Pollution Resear… (2020)

  2. No Access

    Article

    Performance of A2NO-MBR process in treating synthetic and municipal wastewater

    In this study, a novel anaerobic-anoxic/nitrification (A2N) two-sludge sequencing batch reactor (SBR) configured with post-aeration (A2NO-membrane bioreactor process) was conducted to evaluate the operational eff...

    Chuanyi Zhang, Guangrong Sun, Kuixia Zhao in Environmental Science and Pollution Resear… (2018)