![Loading...](https://link.springer.com/static/c4a417b97a76cc2980e3c25e2271af3129e08bbe/images/pdf-preview/spacer.gif)
-
Article
Fast start-up of PN/A process in a single-stage packed bed and mechanism of nitrogen removal
The single-stage partial nitritation–anammox (PN/A) process is severely limited by a long start-up time and unstable removal efficiency. In this study, PN/A was developed in 67 days in a novel packed bed equip...
-
Article
Effect of chemical dose on phosphorus removal and membrane fouling control in a UCT-MBR
To enhance phosphorus removal and make the effluent meet the strict discharge level of total phosphorus (TP, 0.5 mg/L), flocculant dosing is frequently applied. In this study, the performance of aluminum sulfa...
-
Article
Performance of A2NO-MBR process in treating synthetic and municipal wastewater
In this study, a novel anaerobic-anoxic/nitrification (A2N) two-sludge sequencing batch reactor (SBR) configured with post-aeration (A2NO-membrane bioreactor process) was conducted to evaluate the operational eff...
-
Article
Effect of different carbon sources on performance of an A2N-MBR process and its microbial community structure
Effect of different carbon sources on purification performance and change of microbial community structure in a novel A2N-MBR process were investigated. The results showed that when fed with acetate, propionate o...