Abstract
Stopes can be simply defined as an underground opening from which ore has been excavated. Selection of the best combination of available stope boundary will directly affect the profitability of the operation. While a few attempts has been initiated to generate the optimum stope boundary for underground mining, they fail to guarantee a true optimality in three-dimension block models. This paper proposed a new methodology which can find optimum stope layout for a given resource model in three-dimensions. The paper initially critically reviewed important stope boundary optimisation studies thus far, then proposed a new methodology in order to find the best stope layout for a given deposit. Subsequently it applied the proposed methodology into a block model to test its ability of producing optimum results and demonstrated its applicability in a number of different scenarios. In the last section, further analysis on strategies to find the optimum stope boundaries were demonstrated. The results prove that the proposed algorithm can find optimum stope boundaries and layouts in three-dimension for different stope sizes and stope selection strategies.
Similar content being viewed by others
References
Alford C, 1995. Optimisation in underground mine design, 25th International APCOM Symposium, Melbourne. The Australian Institute of Mining and Metallurgy, 213–218.
Alford C, Brazil M, Lee D H, 2007. Optimisation in underground mining, in Handbook of Operations Research in Natural Resources, 561–577.
Alford C, Hall B, 2009. Stope optimisation tools for the selection of optimum cut-off grade in underground mine design, Proceedings of project evaluation conference, Melbourne, 137–144.
Ataee-pour M, 2004. Optimisation of stope limits using a heuristic approach. Mining Technology, 113:123–128.
Ataee-pour M, 2005. A critical survey of the existing stope layout optimization techniques, Journal of Mining Science, 41: 447–466.
Brazil M, Grossman P A, 2003. Grossman, access layout optimisation for underground mines, Australian Mining Technology Conference, Queensland, Australia, 119–128.
Brazil M, Lee D H, Van Leuven M, Rubinstein J H, Thomas D A, Wormald N C, 2003. Optimising declines in underground mines, mining technology. Trans. of the Institution of Mining and Metallurgy, Section A, 112: 164–170.
Cawrse I, 2007. Multiple pass floating stope process, Strategic Mine Planning Conference. Perth, Australia, 87–94.
Dimitrakopoulos R, Grieco N, 2009. Stope design and geological uncertainty: quantification of risk in conventional designs and probabilistic alternative, Journal of Mining Science, 45(2): 152–163.
Grieco N, Dimitrakopoulos R, 2007. Managing grade risk in stope design optimisation: probabilistic mathematical programming modal and application in sublevel sto**, Mining technology, 116: 49–57.
Little J, Nehring M, Topal E, 2008. A new mixed integer programming model for mine production scheduling of sublevel stop** operation, crc mining australian mining Technology Conference. Queensland, Australia.
Nehring M, Topal E, 2007. Mixed integer programming model for mine production scheduling of sublevel sto** Operation, CRC Mining Australian Mining Technology Conference. Western Australia.
Ovanic J, Young D S, 1995. Economic optimization of stope geometry using separable programming with special branch and bound technique, 3rd Canadian conference on Computer Applications in the Minerals Industry. 129–135.
Ovanic J, Young D S, 1999. Economic optimization of open stope geometry, 28th international APCOM symposium. Colorado school of Mines, Golden, Colorado. USA, 855–862.
Sens J J, 2008. Stope boundary optimisation, BSC thesis, University of Queensland, Brisbane, Australia.
Sens J J, Topal E, 2008. A new algorithm for stope boundary optimisation, The AusIMM New Leaders’ Conference. Brisbane, Australia, 25–28.
Topal E, 2008. Early start and late start algorithms to improve the solution time for long term underground mine scheduling, SAIMM, South African Institute of Mining and Metallurgy Journal, 108(2): 99–1 079.
Trout L P, 1995. Underground mine production scheduling using mixed integer programming, 25th International APCOM Symposium, Melbourne. The Australian Institute of Mining and Metallurgy, 395–400.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Topal, E., Sens, J. A new algorithm for stope boundary optimization. J Coal Sci Eng China 16, 113–119 (2010). https://doi.org/10.1007/s12404-010-0201-y
Received:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12404-010-0201-y