Log in

AGV schedule integrated with production in flexible manufacturing systems

  • Published:
The International Journal of Advanced Manufacturing Technology Aims and scope Submit manuscript

Abstract

Flexible manufacturing systems (FMS) comprise, automated machine tools, automated material handling, and automated storage and automated retrieval systems (AS/RS) as essential components. Effective sequencing and scheduling of the material handling systems (MHS) can have a major impact on the productivity of the manufacturing system. The material handling cannot be neglected while scheduling the production tasks. It is necessary to take into account the interaction between machines, material handling systems and computer. In this context, this paper attempts to link the operation of automated guided vehicles (AGV) with the production schedule and suggests a heuristic algorithm that employs vehicle dispatching rules (vdr) for conflict resolution. The vdrs considered in this paper are: shortest operation time (SPT), longest operation time (LPT), longest travel time (LTT) and shortest travel time (STT). The performance of the vdrs in the proposed heuristic is compared with makespan criteria. The results show that the STT provides the best solutions compared to other vdrs.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Subscribe and save

Springer+ Basic
EUR 32.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or Ebook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. D. D. Bedworth and J. E. Bailey, Integrated Production Control Systems, 2nd edn, John Wiley, Singapore, pp. 77, 1987.

    Google Scholar 

  2. A. Eynan and M. J. Rosenblatt, “An interleaving policy in automated storage/retrieval systems”, International Journal of Production Research, 31(1), pp. 1–18, 1993.

    Google Scholar 

  3. R. E. King, T. M. Hodgson and F. W. Chafee, “Robot task scheduling in a flexible manufacturing cell”, IEE Transactions, 25(2), pp. 30–37, 1993.

    Google Scholar 

  4. J. A. Buzacott, “Modelling automated manufacturing systems”, Proceedings of Fall Industrial Engineering Conference, pp. 130–136, 1983.

  5. R. A. Pierson, “Adapting horizontal material handling systems to flexible manufacturing set-ups”, Industrial Engineering, pp. 175–181, 1984.

  6. Y. A. Bozer and M. M. Srinivasan, “Tandem configurations for AGV systems offer simplicity and flexibility”, Industrial Engineering, pp. 23–27, 1989.

  7. N. N. Krishnamoorthy, R. Batta and M. H. Karwan, “Develo** conflict-free routes for automated guided vehicles”, Operations Research Society of America, 41(6), pp. 1077–1090, 1993.

    Google Scholar 

  8. G. Uluso and U. Bilge, “Simultaneous scheduling of machines and automated guided vehicles”, International Journal of Production Research, 31(12), pp. 2857–2873, 19932.

  9. B. Giffler and G. L. Thompson, “Algorithms for solving production scheduling problems”, International Journal of Operations Research, 8, pp. 487–503, 1960.

    Google Scholar 

  10. S. French, Sequencing and Scheduling, Ellis Horwood, London, 1982.

    Google Scholar 

  11. Y. A. Bozer and M. M. Srinivasan, “Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops”, IIE Transactions, 23(1), pp. 72–82, 1991.

    Google Scholar 

  12. P. J. Egbelu and J. M. A. Tanchoco, “Potentials for bi-directional guided-path for AGV based systems”, International Journal of Production Research, 24, pp. 1075–1097, 1986.

    Google Scholar 

  13. J. J. Spinelli, “The effects of load/unload times and networking zoning on an AGV system”, Master's Thesis, Department of Industrial and Management Systems Engineering, Pennsylvania State University, 1987.

  14. N. Raman, F. B. Talbolt and R. V. Rachamadgu, “Simultaneous scheduling of machines and material handling devices in automated manufacturing”, Proceedings of the 2nd ORSA/TIMS Conference on FMS, Amsterdam, pp. 455–466, 1986.

  15. M. M. Srinivasan, Y. A. Bozer and M. Cho, “Trip-based material handling systems: throughput capacity analysis”, IIE Transactions, 26(1), pp. 70–89, 1994.

    Google Scholar 

  16. P. Mellor, “A review of job shop scheduling”, Operations Research Quarterly, 17(2), pp. 161–171, 1966.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Jawahar, N., Aravindan, P., Ponnambalam, S.G. et al. AGV schedule integrated with production in flexible manufacturing systems. Int J Adv Manuf Technol 14, 428–440 (1998). https://doi.org/10.1007/BF01304622

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01304622

Keywords

Navigation