Building refurbishments involve improvement, upgrading, renovation, retrofit, and repair of existing buildings. It is an important sector of the construction industry. Building refurbishment projects are characterized by a high level of complexity and uncertainty which often involves factors such as change in design, inadequate and unavailable information which may initiate conflicts. The aim of this paper is to investigate how the factors cause conflicts. A comprehensive literature review was carried out as part of on-going Ph.D. research program. The review reveals that building refurbishment projects are more uncertain than new building projects and that the uncertainties tend to increase conflicts. This paper concludes that knowledge relating to complexity and uncertainty in refurbishment projects and the factors that cause conflict has to be managed systematically to enable successful project implementation.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
C. O. Egbu, B. A. Young, and V. B. Torrance, “Refurbishment management practices in the ship** and construction industries — lessons to be learned,” Build. Res. Inf., vol. 24, no. 6, pp. 329–338, Nov. 1996.
Y.-K. Juan, Y.-H. Perng, D. Castro-Lacouture, and K.-S. Lu, “Housing refurbishment contractors selection based on a hybrid fuzzy-QFD approach,” Autom. Constr., vol. 18, no. 2, pp. 139–144, Mar. 2009.
B. Sodagar, “Sustainability Potentials of Housing Refurbishment,” Buildings, vol. 3, no. 1, pp. 278–299, Mar. 2013.
N. Kohler and U. Hassler, “The building stock as a research object,” Build. Res. Inf., vol. 30, no. 4, pp. 226–236, Jul. 2002.
A. S. Ali, S. N. Kamaruzzaman, and H. Salleh, “The characteristics of refurbishment projects in Malaysia,” Facilities, vol. 27, no. 1/2, pp. 56–65, 2009.
S. O. Cheung and K. H. Y. Pang, “Anatomy of Construction Disputes,” no. January, pp. 15–23, 2013.
A. S. Ali and I. Rahmat, “Methods of coordination in managing the design process of refurbishment projects,” J. Build. Apprais., vol. 5, no. 1, pp. 87–98, 2009.
I. Bin Rahmat, “The Planning and Control Process of Refurbishment Projects.,” University College London, 1997.
Chew Lee Fuan, “FACTORS AFFECTING TIME PERFORMANCE OF REFURBISHMENT PROJECTS IN SINGAPORE,” UNIVERSITY OF MALAYA, 2012.
C. O. Egbu, “Perceived degree of difficulty of management tasks in construction refurbishment work,” Build. Res. Inf., vol. 23, no. 6, pp. 340–344, Nov. 1995.
A. Ali, “Design information in managing refurbishment projects in Malaysia,” Int. J. Phys. Sci. …, vol. 5, no. June, pp. 768–773, 2010.
P. Mitropoulos and G. Howell, “Model for understanding, preventing, and resolving project disputes,” J. Constr. Eng. …, no. JUNE, pp. 223–231, 2001.
N. Jaffar, A. H. A. Tharim, and M. N. Shuib, “Factors of Conflict in Construction Industry: A Literature Review,” Procedia Eng., vol. 20, pp. 193–202, Jan. 2011.
G. Ofori, “Conflict in Construction,” Constr. Manag. Econ., vol. 31, no. 5, pp. 497–501, May 2013.
I. Rahmat and A. Ali, “The involvement of the key participants in the production of project plans and the planning performance of refurbishment projects,” J. Build. Apprais., vol. 5, no. 3, pp. 273–288, 2010.
D. Baccarini, “The concept of project complexity—a review,” International Journal of Project Management, vol. 14, no. 4. pp. 201–204, 1996.
George L. Head, “an alternative to defining risk as uncertainty,” J. Risk Insur., vol. 34, No. 2, pp. 205–214, 1967.
Project Management institute, A Guide to the Project Management Body of Knowledge, Third Edition (PMBOK Guides). Project Management Institute, 2004.
J. K. Galbraith, The age of uncertainty. Houghton Mifflin, 1977.
G. T. Friedlob and L. L. F. Schleifer, “Fuzzy logic: application for audit risk and uncertainty,” Apr. 2013.
E. Woodhouse, The Future of Technological Civilization | Ned Woodhouse - Academia.edu. 2013.
H. Ng, F. Peña-Mora, and T. Tamaki, “Dynamic conflict management in large-scale design and construction projects,” J. Manag. …, no. April, pp. 52–66, 2007.
J. Diekmann and M. Girard, “Are contract disputes predictable?,” J. Constr. Eng. …, no. December, pp. 355–363, 1995.
N. K. Acharya, Dai Lee Young, and Man Im Hae, “Conflicting factors in construction projects: Korean perspective,” Eng. Constr. Archit. Manag., vol. 13, no. 6, pp. 543–566, 2006.
N. K. Acharya, Y. D. Lee, and J. K. Kim, “Critical construction conflicting factors identification using analytical hierarchy process,” KSCE J. Civ. Eng., vol. 10, no. 3, pp. 165–174, May 2006.
T. Vaaland and H. Håkansson, “Exploring interorganizational conflict in complex projects,” Ind. Mark. Manag., vol. 32, no. 2, pp. 127–138, Feb. 2003.
K. M. J. Harmon, “Conflicts between Owner and Contractors: Proposed Intervention Process,” J. Manag. Eng., vol. 19, no. 3, pp. 121–125, Jul. 2003.
S. J. Meijers, T. Hartmann, and G. P. M. R. Dewulf, “Conflict Management in Concurrent Engineering, a Case Study,” ASCE, 2010.
J. Newstrom, Organizational Behavior: Human Behavior at Work. McGraw-Hill/Irwin, 2010.
O. Daoud, “The architect/engineer’s role in rehabilitation work,” J. Constr. Eng. Manag., no. March, pp. 1–5, 1997.
D. Yates, “Conflict and disputes in the development process: A transaction cost economics perspective,” pp. 1–14, 1998.
A. Yusof, S. Ismail, and L. Chin, “Procurement Method as Conflict and Dispute Reduction Mechanism for Construction Industry in Malaysia,” … Int. Conf. Constr. …, vol. 15, pp. 215–219, 2011.
E. H. W. Chan and H. C. H. Suen, “Dispute resolution management for international construction projects in China,” Manag. Decis., vol. 43, no. 4, pp. 589–602, Jan. 2005.
M. Kumaraswamy, “Conflicts, claims and disputes in construction,” Eng. Constr. …, pp. 95–111, 1997.
Y. Lee and J. . Gilleard, “Collaborative design: a process model for refurbishment,” Autom. Constr., vol. 11, no. 5, pp. 535–544, Aug. 2002.
S. Kemmer and L. Koskela, “DEVELOPING A LEAN MODEL FOR PRODUCTION MANAGEMENT OF REFURBISHMENT PROJECTS,” iglc20.sdsu.edu, 2012.
G. Kelley, “Differing Site Conditions,” Constr. Law An Introd. Eng. …, no. 215, 2008.
R. Krizek, W. Lo, and A. Hadavi, “Lessons learned from multiphase reconstruction project,” J. Constr. Eng. …, no. 7965, pp. 44–54, 1996.
R. Diven and M. R. Taylor, “Demolition Planning,” pp. 1–12, 2006.
J. Miller, Protecting Potential Landmarks Through Demolition Review. Washington, D.C.: The National Trust for Historic Preservation, 2007.
L. K. Quah, “Comparative variability in tender bids for refurbishment and new build work,” Constr. Manag. Econ., vol. 10, no. 3, pp. 263–269, May 1992.
A. Ali and C. Au-Yong, “The designer in refurbishment projects: implications to the compatibility of design,” Struct. Surv., 2013.
A.-S. Ali and C.-P. Au-Yong, “The designer in refurbishment projects: implications to the compatibility of design,” Struct. Surv., vol. 31, no. 3, pp. 202–213, 2013.
D. Ilter, “Identification of the relations between dispute factors and dispute categories in construction projects,” Int. J. Law Built Environ., vol. 4, no. 1, pp. 45–59, 2012.
J. R. Gordon, Organizational Behavior: A Diagnostic Approach (7th Edition), 7th ed. Prentice Hall, 2001.
T. L. Simons and R. S. Peterson, “Task conflict and relationship conflict in top management teams: the pivotal role of intragroup trust.,” J. Appl. Psychol., vol. 85, no. 1, pp. 102–11, Feb. 2000.
E. Martínez-Moreno, P. González-Navarro, A. Zornoza, and P. Ripoll, “Relationship, task and process conflicts on team performance: The moderating role of communication media,” Int. J. Confl. Manag., vol. 20, no. 3, pp. 251–268, 2009.
F. J. Medina, L. Munduate, M. a. Dorado, I. Martínez, and J. M. Guerra, “Types of intragroup conflict and affective reactions,” J. Manag. Psychol., vol. 20, no. 3/4, pp. 219–230, 2005.
R. Pinkley, “Dimensions of conflict frame: Disputant interpretations of conflict.,” J. Appl. Psychol., 1990.
K. a. Jehn, “A Multimethod Examination of the Benefits and Detriments of Intragroup Conflict,” Adm. Sci. Q., vol. 40, no. 2, p. 256, Jun. 1995.
R. W. Griffin and G. Moorhead, Organizational Behavior, 10th ed. Cengage Learning, 2011.
S. O. Cheung, T. W. Yiu, A. Yee, T. Leung, and O. K. Chiu, “Catastrophic Transitions of Construction Contracting Behavior,” no. December, pp. 942–952, 2008.
P. Cakmak and E. Cakmak, “An Analysis of Causes of Disputes in the Construction Industry Using Analytical Hierarchy Process (AHP),” ascelibrary.org, pp. 94–102, Apr. 2013.
P. **ang, J. Zhou, X. Zhou, and K. Ye, “Construction project risk management based on the view of asymmetric information,” … Eng. Manag., no. November, pp. 1303–1311, 2012.
P. Fenn, D. Lowe, and C. Speck, “Conflict and dispute in construction,” Constr. Manag. Econ., vol. 15, no. 6, pp. 513–518, Nov. 1997.
J. Whitfield, Conflict in Construction. John Wiley & Sons, 2012.
Acknowledgments
We are grateful to the RMI (Research Management Institute) of Universiti Teknologi MARA (UiTM) Malaysia, for funding this research by ERGS grant.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2016 Springer Science+Business Media Singapore
About this paper
Cite this paper
Noori, A., Saruwono, M., Adnan, H., Rahmat, I. (2016). Conflict, Complexity, and Uncertainty in Building Refurbishment Projects. In: Yusoff, M., Hamid, N., Arshad, M., Arshad, A., Ridzuan, A., Awang, H. (eds) InCIEC 2015. Springer, Singapore. https://doi.org/10.1007/978-981-10-0155-0_24
Download citation
DOI: https://doi.org/10.1007/978-981-10-0155-0_24
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-10-0154-3
Online ISBN: 978-981-10-0155-0
eBook Packages: EngineeringEngineering (R0)