Abstract
Depending on the contracted business model of an Industrial Product-Service System (IPS2), different processes have to be carried out during the operation phase. The required resources to carry out these processes have to be planned with strategic and operational methods. However, these methods have not yet been utilized in industrial applications. In this paper, the requirements for the transfer and application of the IPS2 resource planning are discussed based on a case study of a global German machine tool manufacturer. The results of the review give valuable indications for the integration of the planning tool for existing machine tool manufacturers.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Similar content being viewed by others
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2013 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Meier, H., Lagemann, H., Dorka, T. (2013). Requirements for Transfer and Application of IPS2 Resource Planning – Case-Study of a Global Machine Tool Manufacturer. In: Shimomura, Y., Kimita, K. (eds) The Philosopher's Stone for Sustainability. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-32847-3_71
Download citation
DOI: https://doi.org/10.1007/978-3-642-32847-3_71
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-32846-6
Online ISBN: 978-3-642-32847-3
eBook Packages: EngineeringEngineering (R0)