Impact of Work-Based Conditions on Labour Productivity of Construction Workers in Ghana

  • Conference paper
  • First Online:
Sustainable Education and Development

Abstract

The aim of this research is to develop a work - based conditions framework for estimating the optimal Construction labour Productivity for labour-intensive works in the Ghanaian construction industry. The objectives of the study are to identify the factors influencing work based condition on labour productivity in Ghanaian construction firms; to determine the level of labour productivity on labour - intensive works in Ghanaian construction firms and to the examine the extent to which the construction labour productivity framework fits into the identified factors the Ghanaian construction firms. Stratified sampling technique was used, based on the diverse nature of the population. Records available at the Ghana Social Opportunity Project (GSOP) indicated that there are 920 professionals involved in labour-intensive works and these comprised 200 Contractors; 200 Site Engineers; 200 Facilitators; 200 Time Keepers; 60 District Engineers and 60 Ghana Social Opportunity Project (GSOP) desk officers. Since not all the district offices were handling road construction projects, purposive sampling technique was used to select 40 districts that were in labour-intensive road construction projects under the GSOP programme. Of the 40 districts, 560 respondents were sampled for the study. The data obtained from the study were analysed and presented in tables and diagrams. The findings established that there were four components that contributed to work based conditions and these: Task system; Beneficiary knowledge of task; Work Expectation and Wage system. It was established that there was low productivity on sites and these were as a result of overcrowding of beneficiaries and the use of more aged in the work since the programme is a social intervention programme to support the poor in the community government encouraged many beneficiaries to be recruited for the programme hence do not follow the work study schedule to determine the required number of beneficiaries for a given task.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
EUR 32.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or Ebook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
GBP 19.95
Price includes VAT (United Kingdom)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
GBP 143.50
Price includes VAT (United Kingdom)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
GBP 179.99
Price includes VAT (United Kingdom)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free ship** worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

References

  • Abdel-Wahab, M.S.: An Examination of the Relationship Between Skills Development and Productivity in the Construction Industry. Loughborough University, Loughborough (2008)

    Google Scholar 

  • Bernold, L.E., AbouRizk, S.M.: Managing Performance in Construction. John Wiley & Sons, New Jersey (2010)

    Book  Google Scholar 

  • Chester, M., Hendrickson, C.: Cost impacts, scheduling impacts, and the claims process during construction. J. Constr. Eng. Manag. 131(1), 102–107 (2005)

    Article  Google Scholar 

  • Dixit, S., Pandey, A.K., Mandal, S.N., Bansal, S.: A study of enabling factors affecting construction productivity: indian scenario. Int. J. Civil Eng. Technol. 8(6), 741–758 (2017)

    Google Scholar 

  • Durdyev, S., Mbachu, J.: Key constraints to labour productivity in residential building projects: evidence from cambodia. Int. J. Constr. Manag. 18(5), 385–393 (2018)

    Google Scholar 

  • Han, S.H., Park, S.H., **, E.J., Kim, H., Seong, Y.K.: Critical issues and possible solutions for motivating foreign construction workers. J. Manag. Eng. 24(4), 217–226 (2008)

    Article  Google Scholar 

  • Jang, H., Kim, K., Kim, J., Kim, J., Labour productivity model for reinforced concrete construction projects. Constr. Innov. 11(1), 92–113 (2011). http://www.emeraldinsight.com/doi/abs/, https://doi.org/10.1108/14714171111104655

  • Jarkas, A., Bitar, C.: Factors affecting construction labor productivity in Kuwait. J. Constr. Eng. Manag. 138(7), 811–820 (2012)

    Article  Google Scholar 

  • Khosrowpour, A., Niebles, J.C., Golparvar-Fard, M.: Vision-based workforce assessment using depth images for activity analysis of interior construction operations. Autom. Constr. 48, 74–87 (2014)

    Article  Google Scholar 

  • Maloney, W.F., McFillen, J.M.: Motivational impact of work crews. J. Constr. Eng. Manag. 113(2), 208–221 (1987)

    Article  Google Scholar 

  • Pallant, J.: SPSS Survival Manual. McGraw-Hill Education, UK (2013)

    Google Scholar 

  • Rosenauer, D., Homan, A.C., Horstmeier, C.A., Voelpel, S.C.: Managing nationality diversity: the interactive effect of leaders’ cultural intelligence and task interdependence. Br. J. Manag. 27(3), 628–645 (2016)

    Google Scholar 

  • Sambasivan, M., Deepak, T.J., Salim, A.N., Ponniah, V.: Analysis of delays in the tanzanian construction industry: transaction cost economics (TCE) and structural equation modelling (SEM) approach. Eng. Constr. Architectural Manag. 24(2), 308–325 (2017)

    Google Scholar 

  • Schwalbe, M.: In search of craft. Soc. Psychol. Q. 73(2), 107–111 (2010)

    Article  Google Scholar 

  • Sibande, A.S., Agumba, N.J.: Construction work productivity in South Africa: a case of gauteng province construction industry. In: Proceedings of the 21st International Symposium on Advancement of Construction Management and Real Estate, pp. 523–533. Springer, Singapore (2018)

    Google Scholar 

  • Tabassi, A.A., Ramli, M., Bakar, A.H.A.: Effects of training and motivation practices on teamwork improvement and task efficiency: the case of construction firms. Int. J. Project Manage. 30(2), 213–224 (2012)

    Article  Google Scholar 

  • Thomas, H.R., Sakarcan, A.S.: Forecasting labour productivity using the factor model. J. Constr. Eng. Manag. 120(1), 228–239 (1994)

    Google Scholar 

  • Udris, I., Nibel, H.: Situational diagnosis vs. social construction of jobs a meta-analysis of the questionnaire “subjective job analysis”. In: Recent Developments in Job Analysis, pp. 79–80. Routledge (2017)

    Google Scholar 

  • Ugulu, R.A.: Investigating the role of on-site learning in the optimisation of craft gang’s productivity in the construction industry (Doctoral dissertation) (2017)

    Google Scholar 

  • Zayed, T.M., Halpin, D.W.: Productivity and cost regression models for pile construction. J. Constr. Eng. Manag. 131(7), 779–789 (2005)

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to E. Bamfo-Agyei .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2021 The Author(s), under exclusive license to Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Bamfo-Agyei, E., Thwala, D.W., Aigbavboa, C.O. (2021). Impact of Work-Based Conditions on Labour Productivity of Construction Workers in Ghana. In: Mojekwu, J.N., Thwala, W., Aigbavboa, C., Atepor, L., Sackey, S. (eds) Sustainable Education and Development. Springer, Cham. https://doi.org/10.1007/978-3-030-68836-3_12

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-68836-3_12

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-68835-6

  • Online ISBN: 978-3-030-68836-3

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics

Navigation