Abstract
This research explores the points of view of practitioners regarding the challenges associated with 4D BIM in Quebec. Quantitative and qualitative data were collected, through an online survey and interviews with various professionals, to understand the current challenges associated with the use of 4D simulation in the construction industry. The importance of certain challenges, from the perspectives of different professionals, are determined, particularly in terms of organization and contracts, IT infrastructures and software, and staff training. The results proposed a new perspective based on the opinions of professionals in the construction industry in Quebec regarding the issues surrounding 4D simulation.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Boton, C., Forgues, D.: The need for a new systemic approach to study collaboration in the construction industry. Procedia Eng. 196, 1043–1050 (2017)
Sacks, R., Eastman, C., Ghang, L., Teicholz, P.: BIM Handbook: A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers, 3rd edn. Wiley, Hoboken, New Jersey (2018)
Boton, C., Forgues, D.: Practices and processes in BIM projects: an exploratory case study. Adv. Civ. Eng. 2018, 1–12 (2018)
Kreider, R., Messner, J., Dubler, C.: Determining the frequency and impact of applying BIM for different purposes on building projects. In: Proceedings 6th International Conference on Innovation in Architecture, Engineering and Construction (AEC), pp. 1–10 (2010)
Boton, C.: Supporting constructability analysis meetings with Immersive Virtual Reality-based collaborative BIM 4D simulation. Autom. Constr. 96, 1–15 (2018)
Sampaio, A.Z.: The introduction of the BIM concept in civil engineering curriculum. Int. J. Eng. Educ. 31, 302–315 (2015)
Kubicki, S., Boton, C.: 4D-based teaching of high-rise structural principles. In: Proceedings of the CIB W78-W102 2011 International Conference, Sophia Antipolis, (2011)
Shah, R.K., Dawood, N., Castro, S.: Automatic generation of progress profiles for earthwork operations using 4D visualisation model. Electron. J. Inf. Technology in Constr. 13, 491–506 (2008)
Yabuki, N., Shitani, T.: A management system for cut and fill earthworks based on 4D CAD and EVMS. In: Proceedings of Computing in Civil Engineering conference. Cancun, Mexico, pp. 1–8 (2005)
Kubicki, S., Boton, C.: IT barometer survey in luxembourg: first results to understand IT innovation in construction sector. In: Computing in Civil and Building Engineering. American Society of Civil Engineers, Orlando, USA, pp. 179–186 (2014)
Vass, S., Gustavsson, T.K.: Challenges when implementing BIM for industry change. Constr. Manage. Econ. 35, 597–610 (2017)
Kassem, M., Brogden, T., Dawood, N.: BIM and 4D planning: a holistic study of the barriers and drivers to widespread adoption. J. Constr. Eng. Proj. Manage. 2, 1–10 (2012)
Brito, D.M., Ferreira, E.A.M.: Strategies for representation and analyses of 4D modeling applied to construction project management. Procedia Econ. Finance 21, 374–382 (2015)
Koo, B., Fischer, M.: Feasibility study of 4D CAD in commercial construction. J. Constr. Eng. Manage. 126, 251–260 (2000)
Tulke, J., Hanff, J.: 4D construction sequence planning: new process and data model. In: Proceedings of 24th CIB-W78 conference “Bringing ITC knowledge to work.” Maribor, Slovenia, pp. 79–84 (2007)
Boton, C., Kubicki, S., Halin, G.: Designing adapted visualization for collaborative 4D applications. Autom. Constr. 36, 152–167 (2013)
Boton, C., Kubicki, S., Halin, G.: The challenge of level of development in 4D/BIM simulation across AEC project lifecyle. A case study. Procedia Eng. 123, 59–67 (2015)
Malleson, A., Kato, H., Pospíšilová, B., Watson, D., Friborg, G.: NBS International BIM Report 2016, p. 24 (2016)
Sediqi, M.: 4D BIM adoption: the incentives for and barriers to 4D BIM adoption within Swedish construction companies, pp. 1–63 (2018)
Mahalingam, A., Kashyap, R., Mahajan, C.: An evaluation of the applicability of 4D CAD on construction projects. Autom. Constr. 19, 148–159 (2010)
McGraw-Hill Construction: SmartMarket Report: The Business Value of BIM in Europe - Getting Building Information Modeling to the Bottom Line in the United Kingdom, France and Germany, (2010)
Gledson, B.J., Greenwood, D.J.: Surveying the extent and use of 4D BIM in the UK. J. Inf. Technol. Constr. (ITcon). 21, 57–71 (2016)
Davis, K.A., Songer, A.D.: Resistance to it change in the AEC industry: are the stereotypes true? J. Constr. Eng. Manage. 135, 1324–1333 (2009)
Waterhouse, R., et al.: NBS International BIM Report 2017, p. 11 (2017)
Buchmann-Slorup, R., Andersson, N.: Bim-based scheduling of construction – a comparative analysis of prevailing and bim-based scheduling processes. In: 27th International Conference on Information Technology in Construction, pp. 113–123, (2010)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Switzerland AG
About this paper
Cite this paper
Campagna-Wilson, J., Boton, C. (2020). Challenges Related to 4D BIM Simulation in the Construction Industry. In: Luo, Y. (eds) Cooperative Design, Visualization, and Engineering. CDVE 2020. Lecture Notes in Computer Science(), vol 12341. Springer, Cham. https://doi.org/10.1007/978-3-030-60816-3_30
Download citation
DOI: https://doi.org/10.1007/978-3-030-60816-3_30
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-60815-6
Online ISBN: 978-3-030-60816-3
eBook Packages: Computer ScienceComputer Science (R0)