Log in

Optimum Consecutive Preventive Maintenance Scheduling Model Considering Reliability

  • Published:
Journal of Shanghai Jiaotong University (Science) Aims and scope Submit manuscript

Abstract

As an effective means for improving system condition and reducing failures, a reasonable preventive maintenance scheduling guarantees the stability and safety of the system. This paper studies a consecutive maintenance scheduling problem for single-component systems with imperfect maintenance, and an optimum model with minimum reliability constraint for minimal cost rate is developed based on the renewal theory. The age-based and reliability-based maintenance strategies are modeled and compared according to a numerical example based on the degradation data of the actual system, which also verifies the optimality of the reliability-based strategy. At last, the influence of some key parameters is discussed by sensitive analysis.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Subscribe and save

Springer+ Basic
EUR 32.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or Ebook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Price includes VAT (Germany)

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. EL-FERIK S. Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy [J]. European Journal of Operational Research, 2008, 186(1): 150–163.

    Article  MathSciNet  MATH  Google Scholar 

  2. BROWM M, PROSCHAN F. Imperfect repair [J]. Journal of Applied Probability, 1983, 20(4): 851–859.

    Article  MathSciNet  MATH  Google Scholar 

  3. OUYANG Y, MADANAT S. Optimal scheduling of rehabilitation activities for multiple pavement facilities: Exact and approximate solutions [J]. Transportation Research Part A: Policy and Practice, 2004, 38(5): 347–365.

    Google Scholar 

  4. CHEN S K, PENG H Q, MAO B H, et al. Optimization model of least-cost-based maintenance schedules for railway traction substations [J]. Journal of the China Railway Society, 2011, 33(8): 39–44 (in Chinese).

    Google Scholar 

  5. NAKAGAWA T. Sequential imperfect preventive maintenance policies [J]. IEEE Transactions on Reliability, 1988, 37(3): 295–298.

    Article  MathSciNet  MATH  Google Scholar 

  6. MALIK M A K. Reliable preventive maintenance scheduling [J]. AIIE Transactions, 1979, 11(3): 221–228.

    Article  Google Scholar 

  7. ZHAO Y C. Optimum maintenance scheduling for locomotives through preventive maintenance strategy [D]. Bei**g: Bei**g Jiaotong University, 2016.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Shaokuan Chen  (陈绍宽).

Additional information

Foundation item: the National Natural Science Foundation of China (Nos. 71571015 and 71621001)

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Liu, G., Long, X., Tong, S. et al. Optimum Consecutive Preventive Maintenance Scheduling Model Considering Reliability. J. Shanghai Jiaotong Univ. (Sci.) 24, 490–495 (2019). https://doi.org/10.1007/s12204-019-2089-z

Download citation

  • Received:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12204-019-2089-z

Keywords

CLC number

Document code

Navigation