Robust Multistage Yard Crane Scheduling in Container Terminals

  • Conference paper
  • First Online:
Operations Research Proceedings 2021 (OR 2021)

Part of the book series: Lecture Notes in Operations Research ((LNOR))

Included in the following conference series:

  • 651 Accesses

Abstract

We deal with robust yard crane scheduling inside a storage block of a container terminal. We consider scenarios with high utilization rates of the cranes, where uncertainties regarding the arrival of transport vehicles at the sea and landside lead to uncertain schedules for the yard cranes. If uncertainties are not incorporated in the scheduling process, the resulting plans can quickly become suboptimal, leading to extended overall completion times that result in delays and can incur penalty costs as a consequence. We present a multistage robust optimization model that allows us to minimize the worst-case objective value by taking into account the uncertain arrival times. Furthermore, we compare our approach with a deterministic model.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
EUR 32.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or Ebook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free ship** worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

References

  1. Briskorn, D., Jaehn, F., Wiehl, A.: A generator for test instances of scheduling problems concerning cranes in transshipment terminals. OR Spectrum 41(1), 45–69 (2018). https://doi.org/10.1007/s00291-018-0529-z

    Article  Google Scholar 

  2. Goerigk, M., Hartisch, M.: Multistage robust discrete optimization via quantified integer programming. Comput. Oper. Res. 135, 105434 (2021)

    Article  Google Scholar 

  3. Hartisch, M.: Quantified integer programming with polyhedral and decision-dependent uncertainty. Ph.D. thesis, Universität Siegen (2020)

    Google Scholar 

  4. He, J., Tan, C., Zhang, Y.: Yard crane scheduling problem in a container terminal considering risk caused by uncertainty. Adv. Eng. Inform. 39, 14–24 (2019)

    Article  Google Scholar 

  5. Ng, W., Mak, K.: Yard crane scheduling in port container terminals. Appl. Math. Model. 29(3), 263–276 (2005)

    Article  Google Scholar 

  6. Stahlbock, R., Voß, S.: Operations research at container terminals: a literature update. OR Spectrum 30, 1–52 (2008)

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Michael Hartisch .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2022 The Author(s), under exclusive license to Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Marx, T., Hartisch, M. (2022). Robust Multistage Yard Crane Scheduling in Container Terminals. In: Trautmann, N., Gnägi, M. (eds) Operations Research Proceedings 2021. OR 2021. Lecture Notes in Operations Research. Springer, Cham. https://doi.org/10.1007/978-3-031-08623-6_40

Download citation

Publish with us

Policies and ethics

Navigation