Skip to main content

and
  1. No Access

    Article

    The shape of a DAG: bounding the response time using long paths

    In 1969, Graham developed a well-known response time bound for a DAG task using the total workload and the longest path of the DAG, which has been widely applied to solve many scheduling and analysis problems ...

    Qingqiang He, Nan Guan, Mingsong Lv, Xu Jiang, Wanli Chang in Real-Time Systems (2024)

  2. Article

    Open Access

    Real-time scheduling for parallel tasks with resource reclamation

    This paper considers the real-time scheduling of a parallel task with reclaiming computing resources, which can be utilized for soft real-time tasks or switching to low-energy mode to save energy. Existing wor...

    Qingqiang He, Yongzheng Sun, Xu Jiang, Mingsong Lv, **kyu Lee in Real-Time Systems (2024)