Skip to main content

and
  1. No Access

    Chapter

    Study on Countermeasures for Risks of Flood Resources Utilization in the Three Gorges Project

    The flood resources utilization of the Three Gorges Reservoir is limited due to the short forecast period of respiration and flood, and results errors. There are also uncertainties in various aspects such as w...

    Shouren Zheng, Zhiyu Zhong, Qiang Zou in Flood Resources Utilization in the Yangtze… (2021)

  2. No Access

    Chapter

    Study on Pre-impounding Method of the Three Gorges Project at the End of Flood Season

    The initial design considers the need for flood control and conducive to the sand discharge. The reservoir arranges to store water in early October after flood. It is very important to complete the water stora...

    Shouren Zheng, Zhiyu Zhong, Qiang Zou in Flood Resources Utilization in the Yangtze… (2021)

  3. No Access

    Chapter

    Conclusion and Prospect

    The basin-wide utilization of flood resources is an important measure to give full play to the characteristics of flood resources, alleviate the shortage of water resources and realize the sustainable developm...

    Shouren Zheng, Zhiyu Zhong, Qiang Zou in Flood Resources Utilization in the Yangtze… (2021)

  4. No Access

    Chapter

    Overall Situation of Yangtze River Basin

    The Yangtze River drains a total area of 1.8 million km2, representing 18.8% of the territorial area of China, with a total mainstream length of 6300 km. The Yangtze River Basin possesses total water resources of...

    Shouren Zheng, Zhiyu Zhong, Qiang Zou in Flood Resources Utilization in the Yangtze… (2021)

  5. No Access

    Chapter

    Study on Regulation Mode of Small and Medium Floods in the Three Gorges Project

    Since the experimental impoundment of the Three Gorges Project in 2008, the maximum flood peak flow rate was 71,200 m3/s, which is much smaller than the design flood (the maximum flood peak flow of 98,800 m3/s). ...

    Shouren Zheng, Zhiyu Zhong, Qiang Zou in Flood Resources Utilization in the Yangtze… (2021)

  6. No Access

    Chapter

    Feasibility Study on Flood Resources Utilization in Yangtze River Basin

    Generally speaking, the evaluation system for flood resources utilization mainly includes the analysis of flood resources utilization methods and utilization level, evaluation of utilization amount and potenti...

    Shouren Zheng, Zhiyu Zhong, Qiang Zou in Flood Resources Utilization in the Yangtze… (2021)

  7. No Access

    Chapter

    Countermeasures for the Utilization of Flood Resources and Risk Reduction in the Yangtze River Basin

    The risk of flood resources utilization refers to the unexpected events and the occurrence probability of using flood resources to solve water shortages and maintain a healthy ecological environment under the ...

    Shouren Zheng, Zhiyu Zhong, Qiang Zou in Flood Resources Utilization in the Yangtze… (2021)

  8. No Access

    Chapter

    Study on Floating Water Level During Flood Season of the Three Gorges

    According to the flood control needs of the middle and lower reaches of the Yangtze River and the requirements of “store clear and dredge muddy” for the reservoir, the preliminary design of the Three Gorges Re...

    Shouren Zheng, Zhiyu Zhong, Qiang Zou in Flood Resources Utilization in the Yangtze… (2021)

  9. No Access

    Chapter

    Necessity of Study

    At present, there are some disputes and differences in the basic concept of flood resources utilization within the academic circles. The existing concepts of flood resources utilization are summarized, compare...

    Shouren Zheng, Zhiyu Zhong, Qiang Zou in Flood Resources Utilization in the Yangtze… (2021)

  10. No Access

    Chapter

    Analysis on Characteristics and Changes of Flow-Sediment in Yangtze River Basin

    The Upstream Yangtze is the reach above Yichang City on the Mainstream Yangtze, draining an area of about 1 million km2

    Shouren Zheng, Zhiyu Zhong, Qiang Zou in Flood Resources Utilization in the Yangtze… (2021)

  11. No Access

    Chapter

    Feasibility Study on Flood Resources Utilization of Three Gorges Project

    The Three Gorges Project take up the tasks for regulating the flood of the Yangtze River to make the **gjiang Reach meet standard-compliance feature to defend the flood in recurrence of 100 years, and in case...

    Shouren Zheng, Zhiyu Zhong, Qiang Zou in Flood Resources Utilization in the Yangtze… (2021)