Research on the Management Fee Claims in Accordance with the Bill of Quantities Valuation Mode in China

  • Conference paper
  • First Online:
The 19th International Conference on Industrial Engineering and Engineering Management
  • 1665 Accesses

Abstract

China engineering project costs claims have large similarity with international claims, and therefore China engineering claims always directly reference to the international research project claims compensation. But the existing researches ignore the difference between China engineering cost constitution and international engineering cost in form. This paper got the structure of the management fee of China through the deductive reasoning method and analyzed the common and difference based on China engineering and international engineering management fee. Finally this paper obtained the management fee claims calculation method under the bill of quantities valuation mode in China, referencing to the international project management selectively, and amending with the actual.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
EUR 32.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or Ebook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
EUR 29.95
Price includes VAT (Thailand)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
EUR 287.83
Price includes VAT (Thailand)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

References

  • He F (2006) The research and system development of hydroelectric engineering construction claims decision analysis. Sichuan university, Chengdu

    Google Scholar 

  • Hu C (2009) Construction contract management and claims. Southeast university press, Nan**g, pp 110–112

    Google Scholar 

  • Jian L (2002) International engineering construction claims. China building industry press, Bei**g, pp 25–27

    Google Scholar 

  • Ministry of construction, China construction bank (1993) A number of provisions on the adjustment of construction and installation costs of project components

    Google Scholar 

  • Ministry of construction, Ministry of finance (2003) The composition of construction and installation cost items

    Google Scholar 

  • Ministry of construction of the people’s republic of China (2003) Code of valuation with bill quantity of construction works (GB50500-2003). China planning press, Bei**g

    Google Scholar 

  • Ministry of housing and urban-rural development of the people’s republic of China (2008) Code of valuation with bill quantity of construction works (GB50500-2008). China planning press, Bei**g

    Google Scholar 

  • Shen J (2005) Engineering evaluation. Southeast university press, Nan**g, pp 329–332

    Google Scholar 

  • Shuibo Z, Yongqiang C (2011) International engineering contract management. China architecture and building press, Bei**g, pp 308–309

    Google Scholar 

  • Wenjie L (2006) Construction project cost composition of the construction claims and the calculation method. Eng Constr 5(20):542–544

    Google Scholar 

  • **aoyong Yuan (2008) Investigate of contractor for claims of the profits and headquarters management fee in international project contracting. Acad forum 8:99–104

    Google Scholar 

  • **aoyu S, Gang G (2005) Analysis of compensation-claiming in supervision cost. J Hebei Inst Archit Civil Eng 23(10):121–123

    Google Scholar 

  • **ngyu Z, **uqin W (2009) International project management fee claim. Int Econ Cooper (3):66–70

    Google Scholar 

  • Yaohuang G, Ya** W (1999) Engineering and claims management. China railway publishing house, Bei**g, pp 75–78

    Google Scholar 

  • Yongqiang C, Shuibo Z (2008) International engineering claim. China architecture and building press, Bei**g, pp 56–57

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Hua Gao .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Gao, H., Sun, T. (2013). Research on the Management Fee Claims in Accordance with the Bill of Quantities Valuation Mode in China. In: Qi, E., Shen, J., Dou, R. (eds) The 19th International Conference on Industrial Engineering and Engineering Management. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-38433-2_15

Download citation

Publish with us

Policies and ethics

Navigation