Log in

A risk-based decision model for rainwater resource supply in forward contracts

  • Published:
Water Resources Management Aims and scope Submit manuscript

Abstract

Rainwater is a supplemental source of water, in addition to surface water and groundwater. In the future market, forward contract is a common mode of trading, but it requires supplier to provide a fixed quantity of supply, which may result in suppliers being unable to fulfill their contracts due to uncertainties. Therefore, determining the contract volume of rainwater resource and evaluating its risk is important for contract negotiations. This paper aims to propose a contract volume risk decision model based on rainfall uncertainty and efficiency uncertainty of rainwater harvesting system (RHS), to provide decision support for determining contract volumes in rainwater resource forward transactions. A mathematical model is first introduced to quantify the uncertainty of rainfall. Then RHS’s efficiency is proposed to indicate how much rainwater resource is able to be provided by RHS per unit amount of rainwater. An optimal operation model is established for simulating the operation of RHS. Uncertainty description of RHS’s efficiency is developed from this RHS simulation model based on the historical rainfall records. Furthermore, the risk of rainwater resource supply is defined as the probability of not being able to fulfill the contract volume and a solution method is proposed. Afterwards, two sets of decision-making processes are proposed for different negotiation scenarios. Finally, this decision support approach is validated using a real-world example, and the results show that the approach provides effective and reasonable support for decision making in rainwater resource forward trading.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Subscribe and save

Springer+ Basic
EUR 32.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or Ebook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4

Similar content being viewed by others

Availability of Data and Materials

All data and materials are available from the corresponding author on request.

References

Download references

Funding

This work was supported by the National Key R&D Program of China (Grant No. 2018YFE0206200); the Project funded by China Postdoctoral Science Foundation (Grant No. 2019M661884); the Natural Science Foundation of Jiangsu Province, China (Grant No. BK20200160); the Special Research Fund of Nan**g Hydraulic Research Institute (Grant No. Y120006).

Author information

Authors and Affiliations

Authors

Contributions

Conceptualization: YZ, SW; Methodology: YZ, HS; Formal analysis and investigation: YZ, BX; Writing—original draft preparation: YZ, LY, QY; Writing—review and editing: YZ, JD, XW, SW; Funding acquisition: YZ; Resources: XW; Supervision: SW.

Corresponding authors

Correspondence to Yu Zhang, **ufeng Wu, Shiqiang Wu or Jiangyu Dai.

Ethics declarations

Ethical Approval

Not applicable.

Consent to Participate

Not applicable.

Consent to Publish

Not applicable.

Competing Interests

The authors declare that they have no competing interests.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Zhang, Y., Sha, H., Wu, X. et al. A risk-based decision model for rainwater resource supply in forward contracts. Water Resour Manage 36, 1919–1936 (2022). https://doi.org/10.1007/s11269-022-03115-2

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11269-022-03115-2

Keywords

Navigation